Local news for Toronto, York Region and the GTA

York Region

Kennedy Road in Markham to Close for Railway Rehabilitation Work

A section of Kennedy Road in Markham will temporarily close from November 20 to November 24, 2026, for railway crossing rehabilitation.

Read this story in Persian (فارسی)

Temporary Kennedy Road Closure Planned in Markham for Rail Repairs — AI-generated editorial image
Editorial illustration; not a photo of a real event.

This report by Farshad Fazaeli is based on information published by York Region.

Kennedy Road between Steeles Avenue and 14th Avenue in the City of Markham, York Region, will temporarily close from Friday, November 20, 2026, at 10 p.m. until Tuesday, November 24, 2026, at 6 a.m. for Metrolinx railway crossing rehabilitation and York Region road restoration.

What work is taking place?

Metrolinx is completing railway crossing rehabilitation work on Kennedy Road in the City of Markham. Once this railway rehabilitation is finished, York Region will restore the adjacent roadway. To facilitate these infrastructure repairs safely, a complete temporary road closure is required between Steeles Avenue and 14th Avenue.

When is the closure scheduled?

The closure is scheduled to begin on Friday, November 20, 2026, at 10 p.m. and will remain in effect until Tuesday, November 24, 2026, at 6 a.m. As with all construction projects, the work may be rescheduled in the event of adverse weather conditions. York Region and Metrolinx have stated that advance notice will be provided where possible if scheduling adjustments are required.

Who is affected and how will traffic detour?

The temporary road closure affects vehicular traffic, pedestrians, transit riders, and emergency response services across this corridor:

  • Traffic and Pedestrians: Both general traffic and pedestrians must detour around the active closure zone. Directional signs will be installed in the area to guide travellers.
  • Local Access: Northbound access on Kennedy Road will be maintained up to Clayton Drive, while southbound access will be maintained up to Gorvette Road. Local access to properties located within the closure limits will remain accessible.
  • Emergency Services: Emergency services travelling across the rail corridor will be required to utilize detour routes to reach locations on the opposite side of the railway crossing.
  • Public Transit: York Region Transit routes will follow detours during the construction window, with updated transit schedules available at yrt.ca. Additionally, GO Transit service may experience disruptions, and riders are advised to check gotransit.com/Schedules prior to travelling.

How can residents contact project staff?

York Region invites members of the community who have questions or concerns to contact staff by phone at 1-877-464-9675 or through TTY at 711. An after-hours emergency line is also accessible at 1-877-464-9675 extension 75200. Members of the public reaching out regarding this project should quote Kennedy Road closure in their inquiry.

According to York Region. Source: York Region

What it means for residents

Commuters and residents in Markham and across York Region will face detours around the Kennedy Road rail crossing between Steeles Avenue and 14th Avenue. Because emergency vehicles, general traffic, pedestrians, and YRT transit lines must detour around the tracks, nearby corridors such as Warden Avenue or McCowan Road may see increased traffic flow over the closure weekend.

Frequently asked questions

Where and when will Kennedy Road be closed?

Kennedy Road will be closed between Steeles Avenue and 14th Avenue in Markham from Friday, November 20, 2026, at 10 p.m. to Tuesday, November 24, 2026, at 6 a.m.

Will local property access be maintained during the closure?

Yes, local property access within the closure limits will be maintained, with northbound access up to Clayton Drive and southbound access up to Gorvette Road.

How will public transit be impacted by the road closure?

York Region Transit routes will be detoured, and GO Transit service may experience disruptions during the rehabilitation work.

Source

Views: 0

Spotted an error? See our corrections policy.

Published by MELK GROUP LTD, Richmond Hill, ON · info@torontodaily.ca · 437-888-1651